Factors Affecting the Productivity of Building Craftsmen--Studies of Uganda (Report) Factors Affecting the Productivity of Building Craftsmen--Studies of Uganda (Report)

Factors Affecting the Productivity of Building Craftsmen--Studies of Uganda (Report‪)‬

Journal of Civil Engineering and Management 2007, Sept, 13, 3

    • $5.99
    • $5.99

Publisher Description

Abstract. Poor productivity of construction workers is one of the causes of cost and time overruns in construction projects. The productivity of labour is particularly important especially in developing countries, where most of the building construction work is still on manual basis. This paper reports on a survey made on project managers of building projects in Uganda, where an increase in productivity is being sought. Respondents were required to rate using their experience how 36 factors affect productivity with respect to time, cost and quality. The survey was carried out by a questionnaire and responses received over a period of 3 months. The ten most significant problems affecting labour productivity were identified as incompetent supervisors; lack of skills from the workers; rework; lack of tools/equipment; poor construction methods; poor communication; inaccurate drawings; stoppages because of work being rejected by consultants; political insecurity; tools/equipment breakdown; and harsh weather conditions. Although lack of materials is ranked highest with regard to average rating on loss of time, it was not ranked among the top ten using the importance index that takes into account time, cost as well as work quality. The policy makers and researchers should focus on the identified major factors in order to improve productivity. Keywords: labour, productivity, factors, developing countries, building sector, craftsmen.

GENRE
Professional & Technical
RELEASED
2007
1 September
LANGUAGE
EN
English
LENGTH
27
Pages
PUBLISHER
Vilnius Gediminas Technical University
SELLER
The Gale Group, Inc., a Delaware corporation and an affiliate of Cengage Learning, Inc.
SIZE
211.6
KB

More Books Like This

Advanced Manufacturing Technologies and Workforce Development Advanced Manufacturing Technologies and Workforce Development
2014
Industrial Engineering and Operations Management I Industrial Engineering and Operations Management I
2019
Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate
2021
Total Quality Management and Just-in-Time Purchasing Total Quality Management and Just-in-Time Purchasing
2013
Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate
2013
IS Offshoring IS Offshoring
2009

More Books by Journal of Civil Engineering and Management

Factors Affecting the Performance of Construction Projects in the Gaza Strip/Veiksniai, Lemiantys Statybos Projektu Igyvendinima Gazos Ruoze (Report) Factors Affecting the Performance of Construction Projects in the Gaza Strip/Veiksniai, Lemiantys Statybos Projektu Igyvendinima Gazos Ruoze (Report)
2009
Marketing Practices of Professional Engineering Consulting Firms: Implement Or Not to Implement?/Rinkodaros Praktika Profesionaliose Inzinerijos Konsultacinese Imonese: Taikyti Ja Ar Jos Netaikyti? Marketing Practices of Professional Engineering Consulting Firms: Implement Or Not to Implement?/Rinkodaros Praktika Profesionaliose Inzinerijos Konsultacinese Imonese: Taikyti Ja Ar Jos Netaikyti?
2008
Influence of Quality Performance on Clients' Patronage of Indigenous and Expatriate Construction Contractors in Nigeria/ Vieteniu Ir Emigravusiu Nigerijos Statybos Rangovu Darbo Kokybes Itaka Klientams (Report) Influence of Quality Performance on Clients' Patronage of Indigenous and Expatriate Construction Contractors in Nigeria/ Vieteniu Ir Emigravusiu Nigerijos Statybos Rangovu Darbo Kokybes Itaka Klientams (Report)
2010
Identification of Important Organisational Factors Influencing Safety Work Behaviours in Construction Projects/Saugia Elgsena Statybose Veikianciu Organizaciniu Veiksniu Nustatymas (Report) Identification of Important Organisational Factors Influencing Safety Work Behaviours in Construction Projects/Saugia Elgsena Statybose Veikianciu Organizaciniu Veiksniu Nustatymas (Report)
2011
A Comparative Analysis of the Performance of Traditional Contracting and Design-Build Procurements on Client Objectives in Nigeria/Tradiciniu Statybos Rangos Ir Projektavimo Bei Statybos Pirkimu Vykdymo, Atsizvelgiant I Uzsakovo Tikslus, Lyginamoji Analize Nigerijoje (Report) A Comparative Analysis of the Performance of Traditional Contracting and Design-Build Procurements on Client Objectives in Nigeria/Tradiciniu Statybos Rangos Ir Projektavimo Bei Statybos Pirkimu Vykdymo, Atsizvelgiant I Uzsakovo Tikslus, Lyginamoji Analize Nigerijoje (Report)
2011
Precast Concrete Systems in Developing vs. Industrialized Countries/Surenkamojo Gelzbetonio Sistemos Besivystanciose Ir Industrializuotose Salyse (Report) Precast Concrete Systems in Developing vs. Industrialized Countries/Surenkamojo Gelzbetonio Sistemos Besivystanciose Ir Industrializuotose Salyse (Report)
2010