Interim Design Assessment for the Blue Grass Chemical Agent Destruction Pilot Plant Interim Design Assessment for the Blue Grass Chemical Agent Destruction Pilot Plant

Interim Design Assessment for the Blue Grass Chemical Agent Destruction Pilot Plant

    • $15.99
    • $15.99

Publisher Description

Because of concerns about incineration, the Department of Defense plans to use alternative means to destroy the chemical agent stockpiles at the Pueblo and Blue Grass facilities. The DOD contracted with Bechtel Parsons to design and operate pilot plants for this purpose. As part of the NRC efforts to assist the DOD with its chemical demilitarization efforts, the Department requested a review and assessment of the Bechtel designs for both plants. An earlier report presented an assessment of the Pueblo design. This report provides a review of the Blue Grass Chemical Agent Destruction Pilot Plant based on review of data and information about the initial design and some intermediate design data. Among other topics, the report presents technical risk assessment issues, an analysis of delivery and disassembly operations and of agent destruction core processes, and an examination of waste treatment.

GENRE
Science & Nature
RELEASED
2005
25 October
LANGUAGE
EN
English
LENGTH
94
Pages
PUBLISHER
National Academies Press
SELLER
National Academy of Sciences
SIZE
1.2
MB
Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant Evaluation of Future Strategic and Energy Efficient Options for the U.S. Capitol Power Plant
2009
The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience The Use and Storage of Methyl Isocyanate (MIC) at Bayer CropScience
2012
Progress in Improving Project Management at the Department of Energy Progress in Improving Project Management at the Department of Energy
2004
Water Resources Planning for the Upper Mississippi River and Illinois Waterway Water Resources Planning for the Upper Mississippi River and Illinois Waterway
2005
Review Procedures for Water Resources Project Planning Review Procedures for Water Resources Project Planning
2002
A Strategic Vision for Department of Energy Environmental Quality Research and Development A Strategic Vision for Department of Energy Environmental Quality Research and Development
2001