CPSIM2: The Critical Path Simulator (Windows Version) CPSIM2: The Critical Path Simulator (Windows Version)

CPSIM2: The Critical Path Simulator (Windows Version‪)‬

9B06D002

    • $3.99
    • $3.99

Publisher Description

CPSim2 is a Critical Path Simulator that runs under MS Windows. Participants use the simulator to manage the construction of an automated factory - a fairly complex, 43-activity project that must be completed in 107 days if penalties are to be avoided. As project manager, students must make effective trade-offs between the costs incurred by crashing (speeding up) activities, and the financial penalties for late completion. Unforeseen delays and speedups occur during the project, which require timely response. Although these appear "random," each user of the simulator is exposed to the same events during the project. This allows performances and strategies to be compared within a class and between classes. CPSim2 maintains a current display of the project's CPM network, as well as the critical path(s) and activity slacks. The time required to complete the exercise is controlled by CPSim2, and does not exceed 60 minutes. This product provides the student instructions on the running of the simulation; the software itself is distributed with a site license for an additional annual license fee (product 7B06D002) - contact Ivey Publishing for pricing and distribution information.

GENRE
Business & Personal Finance
RELEASED
2006
January 11
LANGUAGE
EN
English
LENGTH
6
Pages
PUBLISHER
Richard Ivey School of Business Foundation
SELLER
Ivey Business School Foundation
SIZE
1.1
MB
Integrated Project Management Sourcebook Integrated Project Management Sourcebook
2016
Remote Projects Follow-up with Scrum-Excel Burn Down Chart Remote Projects Follow-up with Scrum-Excel Burn Down Chart
2020
Scope Value Management: A Model to Measure Scope Performance and Drive Value Delivery Scope Value Management: A Model to Measure Scope Performance and Drive Value Delivery
2017
Management Science, Operations Research and Project Management Management Science, Operations Research and Project Management
2016
Essays in Production, Project Planning and Scheduling Essays in Production, Project Planning and Scheduling
2013
Flexibility and Robustness in Scheduling Flexibility and Robustness in Scheduling
2013
Process Innovation: The Crucial Facilitator of Product Innovation Process Innovation: The Crucial Facilitator of Product Innovation
2008
Real Labour-management Teamwork: An Idea whose Time is due Real Labour-management Teamwork: An Idea whose Time is due
2009
Reversing the Tide in Canadian Manufacturing Reversing the Tide in Canadian Manufacturing
2008
ForeFront Manufacturing: Production Processes and Change Management in Mainland China ForeFront Manufacturing: Production Processes and Change Management in Mainland China
2006
Note on Material Requirements Planning Note on Material Requirements Planning
2007
Alara Agri: Fresh Cherry Production Alara Agri: Fresh Cherry Production
2009