From DBR to Simplified-DBR for Make-to-Order (Chapter 9 of Theory of Constraints Handbook) From DBR to Simplified-DBR for Make-to-Order (Chapter 9 of Theory of Constraints Handbook)

From DBR to Simplified-DBR for Make-to-Order (Chapter 9 of Theory of Constraints Handbook‪)‬

    • $6.99
    • $6.99

Publisher Description

This is an individual chapter of Theory of Constraints Handbook. Simplified-Drum-buffer-rope (S-DBR) is a variation on the well-known Drum-buffer-rope (DBR) production planning methodology. The chapter explains the change in thought that has guided the change, and then details the new features of the S-DBR method for make-to-order. The planning process is analyzed by three different perspectives. First, by the five focusing steps, a cornerstone in the TOC thinking. The second by recognizing the distinction between planning and execution that aim to handle the uncertainty in the best way. The last perspective is the four rules of flow, Dr. Goldratt’s reflections on the achievements of Henry Ford and Dr. Ohno. The chapter explains the main ingredients of the planning methodology: the use of just one buffer, the load control on the weakest link (planned-load), and how they determine the safe-date for any new order. Then the role of buffer management to handle the one and only priority scheme in the shop is explained in detail. Additional issues include the use of capacity reservation to handle situations of committing to very fast response to certain customers. Also discussed is the idea of the “lack” taking advantage of offering the standard lead-times rather than offering the earlier safe-date. The scope of S-DBR is carefully analyzed showing how most of the ‘complexities’ of certain shop floors can be resolved. Situations where certain changes to S-DBR are necessary are analyzed as well. The last part of the chapter deals with implementation issues.

GENRE
Business & Personal Finance
RELEASED
2010
April 29
LANGUAGE
EN
English
LENGTH
30
Pages
PUBLISHER
McGraw-Hill
SELLER
McGraw-Hill Global Education Holdings, LLC
SIZE
6.3
MB
Managing Make-to-Stock and the Concept of Make-to-Availability (Chapter 10 of Theory of Constraints Handbook) Managing Make-to-Stock and the Concept of Make-to-Availability (Chapter 10 of Theory of Constraints Handbook)
2010
Supply Chain Management (Chapter 11 of Theory of Constraints Handbook) Supply Chain Management (Chapter 11 of Theory of Constraints Handbook)
2010
Production Planning with Capacitated Resources and Congestion Production Planning with Capacitated Resources and Congestion
2020
Planning Production and Inventories in the Extended Enterprise Planning Production and Inventories in the Extended Enterprise
2011
Excellence in Inventory Management Excellence in Inventory Management
2012
Resolving Measurement/Performance Dilemmas (Chapter 14 of Theory of Constraints Handbook) Resolving Measurement/Performance Dilemmas (Chapter 14 of Theory of Constraints Handbook)
2010
ERP ERP
2003
Manufacturing at Warp Speed Manufacturing at Warp Speed
2000
Throughput Economics Throughput Economics
2019
Managing Make-to-Stock and the Concept of Make-to-Availability (Chapter 10 of Theory of Constraints Handbook) Managing Make-to-Stock and the Concept of Make-to-Availability (Chapter 10 of Theory of Constraints Handbook)
2010