NASA's Management and Development of Spacesuits: Critical Report of the Inspector General, Shortage of Extravehicular Mobility Units (EMUs) for Space Station, Development of Exploration and Mars Suits NASA's Management and Development of Spacesuits: Critical Report of the Inspector General, Shortage of Extravehicular Mobility Units (EMUs) for Space Station, Development of Exploration and Mars Suits

NASA's Management and Development of Spacesuits: Critical Report of the Inspector General, Shortage of Extravehicular Mobility Units (EMUs) for Space Station, Development of Exploration and Mars Suits

    • $8.99
    • $8.99

Publisher Description

NASA continues to manage an array of design and health risks associated with the EMUs used by ISS crew. In addition, only 11 of the 18 original EMU Primary Life Support System units - a backpack-like structure that performs a variety of functions required to keep an astronaut alive during a spacewalk - are still in use, raising concerns that the inventory may not be adequate to last through the planned retirement of the ISS. Given these issues, NASA will be challenged to continue to support ISS needs with the current fleet of EMUs through 2024, a challenge that will escalate significantly if Station operations are extended to 2028.
Despite spending nearly $200 million on NASA's next-generation spacesuit technologies, the Agency remains years away from having a flight-ready spacesuit capable of replacing the EMU or suitable for use on future exploration missions. As different missions require different designs, the lack of a formal plan and specific destinations for future missions has complicated spacesuit development. Moreover, the Agency has reduced the funding dedicated to spacesuit development in favor of other priorities such as an in-space habitat.
After examining these spacesuit development efforts, we question NASA's decision to continue funding a contract associated with the Constellation Program after cancellation of that Program and a recommendation made by Johnson Space Center officials in 2011 to cancel the contract. Rather than terminate the contract, NASA paid the contractor $80.8 million between 2011 and 2016 for spacesuit technology development, despite parallel development activities being conducted within NASA's Advanced Exploration Systems Division. Moreover, given the current development schedule, a significant risk exists that a next-generation spacesuit prototype will not be sufficiently mature in time to test it on the ISS prior to 2024. Finally, little schedule margin exists between anticipated delivery of the Orion Crew Survival System spacesuit in March 2021 and NASA's current internal launch date of August 2021 for its first crewed mission beyond low Earth orbit.

GENRE
Science & Nature
RELEASED
2017
May 1
LANGUAGE
EN
English
LENGTH
72
Pages
PUBLISHER
Progressive Management
SELLER
Draft2Digital, LLC
SIZE
1.6
MB

More Books Like This

Nasa New Millennium Problems and Solutions Nasa New Millennium Problems and Solutions
2001
Preparing for the High Frontier Preparing for the High Frontier
2011
International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans International Space Station (ISS): Planning for the Extension of Utilization Through 2020, including Spare Parts, Safety, and Reliability - GAO Study of NASA Plans
2012
Lessons Learned in the Implementation of NASA's Earth Venture Class Lessons Learned in the Implementation of NASA's Earth Venture Class
2022
Advanced Technology for Human Support in Space Advanced Technology for Human Support in Space
1997
Pathways to Exploration Pathways to Exploration
2014

More Books by Progressive Management

21st Century U.S. Military Manuals: Sniper Training - FM 23-10 - Marksmanship, Equipment, Ballistics, Weapon Capabilities, Sniping Techniques (Value-Added Professional Format Series) 21st Century U.S. Military Manuals: Sniper Training - FM 23-10 - Marksmanship, Equipment, Ballistics, Weapon Capabilities, Sniping Techniques (Value-Added Professional Format Series)
2011
Apollo and America's Moon Landing Program: History of the Development Program of the Saturn Rocket and the Saturn V from 1957 to 1968 by the Marshall Space Flight Center Apollo and America's Moon Landing Program: History of the Development Program of the Saturn Rocket and the Saturn V from 1957 to 1968 by the Marshall Space Flight Center
2012
The Effects of Nuclear Weapons: Glasstone and Dolan Authoritative Military Reference on Atomic Explosions, Blast Damage, Radiation, Fallout, EMP, Biological, Radio and Radar Effects The Effects of Nuclear Weapons: Glasstone and Dolan Authoritative Military Reference on Atomic Explosions, Blast Damage, Radiation, Fallout, EMP, Biological, Radio and Radar Effects
2011
The Smell of Kerosene: A Test Pilot's Odyssey - NASA Research Pilot Stories, XB-70 Tragic Collision, M2-F1 Lifting Body, YF-12 Blackbird, Apollo LLRV Lunar Landing Research Vehicle (NASA SP-4108) The Smell of Kerosene: A Test Pilot's Odyssey - NASA Research Pilot Stories, XB-70 Tragic Collision, M2-F1 Lifting Body, YF-12 Blackbird, Apollo LLRV Lunar Landing Research Vehicle (NASA SP-4108)
2012
War in the Balkans, 1991-2002: Comprehensive History of Wars Provoked by Yugoslav Collapse: Balkan Region in World Politics, Slovenia and Croatia, Bosnia-Herzegovina, Kosovo, Greece, Turkey, Cyprus War in the Balkans, 1991-2002: Comprehensive History of Wars Provoked by Yugoslav Collapse: Balkan Region in World Politics, Slovenia and Croatia, Bosnia-Herzegovina, Kosovo, Greece, Turkey, Cyprus
2014
Saturn V Flight Manual: Astronaut's Guide to the Apollo Moon Rocket Saturn V Flight Manual: Astronaut's Guide to the Apollo Moon Rocket
2011