Practical Schedule Risk Analysis Practical Schedule Risk Analysis

Practical Schedule Risk Analysis

    • $74.99
    • $74.99

Publisher Description

Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions. The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong. A schedule risk analysis explores the implications for the project's schedule of risk to the activity durations and also identifies the most important schedule risks. This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level: * Why is the duration uncertain? * And how do we represent this uncertainty with a probability distribution? These are then progressively elaborated: * How does uncertainty of activities along a path lead to more uncertainty of the path's completion date? * How can a schedule with parallel paths be riskier than each of the paths individually? * How can we represent risks about activities that are not in the schedule at all? Culminating in a discussion of the most powerful and advanced capabilities available in current commercial software. Schedule risk analysis is a process that is industry-independent, and the methods explained in this volume have been used by the author with positive effect in such industries as construction, oil and gas, information systems, environmental restoration and aerospace/defense. The result is a book that is not only highly practical; something that people within all types of projects and in all industries can apply themselves; but that is an extraordinarily complete guide to creating and managing a rigorous project schedule.

GENRE
Business & Personal Finance
RELEASED
2016
April 8
LANGUAGE
EN
English
LENGTH
240
Pages
PUBLISHER
Taylor & Francis
SELLER
Taylor & Francis Group
SIZE
8.2
MB
How to Manage Project Opportunity and Risk How to Manage Project Opportunity and Risk
2011
Handbook on Project Management and Scheduling Vol. 2 Handbook on Project Management and Scheduling Vol. 2
2015
Decide to Succeed Decide to Succeed
2020
Project Management with Dynamic Scheduling Project Management with Dynamic Scheduling
2013
Faster Construction Projects with CPM Scheduling Faster Construction Projects with CPM Scheduling
2007
Managing Project Uncertainty Managing Project Uncertainty
2017