Critical Path Critical Path

Beschreibung des Verlags

The masterwork of a brilliant career, and an important document of the crisis now facing mankind.


Today we find ourselves in the midst of the greatest crisis in the history of the human race. Technology has placed in our hands almost unlimited power at the very moment when we have run up against the limits of our resources aboard Spaceship Earth, as the crises of the late twentieth century—political, economic, environmental, and ethical—determine whether or not humanity survives. In this masterful summing up of an entire lifetime’s thought and concern, R. Buckminster Fuller addresses these crucial issues in his most significant, accessible, and urgent work.

Critical Path traces the origins and evolution of humanity’s social, political, and economic systems from the obscure mists of prehistory, through the development of the great political empires, to the vast international corporate and political systems that control our destiny today to show how we got to our present situation and what options are available to man. With his customary brilliance, extraordinary energy, and unlimited devotion, Bucky Fuller shows how mankind can survive, and how each individual can respond to the unprecedented threat we face today.

The crowning achievement of an extraordinary career, Critical Path offers the reader the excitement of understanding the essential dilemmas of our time and how responsible citizens can rise to meet this ultimate challenge to our future.

  • GENRE
    Kultur und Unterhaltung
    ERSCHIENEN
    2015
    15. September
    SPRACHE
    EN
    Englisch
    UMFANG
    891
    Seiten
    VERLAG
    The Estate of R. Buckminster Fuller
    ANBIETERINFO
    The Estate of R. Buckminster Fuller
    GRÖSSE
    82,5
     MB
    Grunch of Giants Grunch of Giants
    2016
    Operating Manual for Spaceship Earth Operating Manual for Spaceship Earth
    2015
    How Design Makes the World How Design Makes the World
    2020
    Curiosities Revealed Curiosities Revealed
    2024
    How Buildings Learn How Buildings Learn
    1994
    The World Set Free The World Set Free
    2025
    Operating Manual for Spaceship Earth Operating Manual for Spaceship Earth
    2015
    Grunch of Giants Grunch of Giants
    2016
    Utopia or Oblivion Utopia or Oblivion
    1968
    Earth, Inc. Earth, Inc.
    1973
    Education Automation Education Automation
    1962