Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)

Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition‪)‬

    • USD 9.99
    • USD 9.99

Descripción editorial

The Law Library presents the complete text of the Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition).
Updated as of May 29, 2018

The Federal Energy Regulatory Commission (Commission) is eliminating the exemptions for wind generators from the requirement to provide reactive power by revising the pro forma Large Generator Interconnection Agreement (LGIA), Appendix G to the pro forma LGIA, and the pro forma Small Generator Interconnection Agreement (SGIA). As a result, all newly interconnecting non-synchronous generators will be required to provide reactive power at the high-side of the generator substation as a condition of interconnection as set forth in their LGIA or SGIA as of the effective date of this Final Rule.

This ebook contains:
- The complete text of the Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)
- A dynamic table of content linking to each section
- A table of contents in introduction presenting a general overview of the structure

GÉNERO
Técnicos y profesionales
PUBLICADO
2018
8 de octubre
IDIOMA
EN
Inglés
EXTENSIÓN
76
Páginas
EDITORIAL
The Law Library
VENDEDOR
FB Editions
TAMAÑO
197.2
KB

Más libros de The Law Library

VAT for businesses if there's no Brexit deal - Prepare for EU Exit (Brexit Guide) VAT for businesses if there's no Brexit deal - Prepare for EU Exit (Brexit Guide)
2019
Consumer rights if there's no Brexit deal - Prepare for EU Exit (Brexit Guide) Consumer rights if there's no Brexit deal - Prepare for EU Exit (Brexit Guide)
2019
Structuring your business if there's no Brexit deal - Prepare for EU Exit (Brexit Guide) Structuring your business if there's no Brexit deal - Prepare for EU Exit (Brexit Guide)
2019
Employing EU citizens - Prepare for EU Exit (Brexit Guide) Employing EU citizens - Prepare for EU Exit (Brexit Guide)
2019
Zambia - Millennium Challenge Compact (13-1115) (United States Treaty) Zambia - Millennium Challenge Compact (13-1115) (United States Treaty)
2019
Vietnam - Arrangement for the Exchange of Technical Information and Cooperation in Nuclear Safety Matters (13-509) (United States Treaty) Vietnam - Arrangement for the Exchange of Technical Information and Cooperation in Nuclear Safety Matters (13-509) (United States Treaty)
2019