Communication Deficiencies: A Case Study in Project Management Communication Deficiencies: A Case Study in Project Management

Communication Deficiencies: A Case Study in Project Management

A Case Study in Project Management

    • 5,0 • 1 note

Description de l’éditeur

In this fictionalized case study, Robert Perrine describes what a typical project looks like within information technology. The project is already behind schedule when Robert arrives. There is no agreement on scope and the project budget is being siphoned away. Somehow Robert needs to bring the team together and get the work accomplished before they run out of time, money or sanity.

The lesson learned is that effective communication requires filtering of the damaging aspects with amplification of the growth promoting aspects.

GENRE
Romans et littérature
SORTIE
2010
17 août
LANGUE
EN
Anglais
LONGUEUR
211
Pages
ÉDITIONS
Robert Perrine
TAILLE
424,7
Ko

Plus de livres par Robert Perrine

Presentations on the Critical Path Method Presentations on the Critical Path Method
2010
Workplace Ecology: A Case Study in Project Management Workplace Ecology: A Case Study in Project Management
2010
Survey of HR for Projects Survey of HR for Projects
2010
ITIL Integration Exercises ITIL Integration Exercises
2010
Demonstrating Design for Six Sigma Demonstrating Design for Six Sigma
2010
Presentations on Classical ITIL Presentations on Classical ITIL
2010

D’autres ont aussi acheté

Development Project Management Development Project Management
2014
Project Cycle Management Project Cycle Management
2012
Little Book of Project Management Tips Little Book of Project Management Tips
2016
Bare Knuckled Project Management: How to Succeed at Every Project Bare Knuckled Project Management: How to Succeed at Every Project
2013
Managing Projects of all Sizes Managing Projects of all Sizes
2014
Step by Step Project Planning Step by Step Project Planning
2014