Effective Conservation Measures Needed Effective Conservation Measures Needed

Effective Conservation Measures Needed

Energy Update 2011, June 30, 5, 50

    • 2,99 €
    • 2,99 €

Description de l’éditeur

Byline: Engr Tahir Basharat Cheema - Email: cheema_tahir@yahoo.com Pakistan is facing debilitating power shortages since the last five years. The crunch is surely on account of the apathy of a whole decade, which started as a backlash to the induction of IPPs and the ensuing glut in late 1990s. Instead of making the best out of it by considering the same as an opportunity, we simply lost our cool and stayed off-course. The consumption led growth strategy compounded by fast and unwarranted urbanization and rise in standards of living (not much supported by the pre-requisites for the same) further spoilt the broth. Now we are short of power, gas, have broken all records of oil import and lastly are becoming a water scarce country. Besides deficits, the issue of affordability has also arisen. All in all, a very serious situation!

GENRE
Entreprise et management
SORTIE
2011
30 juin
LANGUE
EN
Anglais
LONGUEUR
5
Pages
ÉDITIONS
Asianet-Pakistan
DÉTAILS DU FOURNISSEUR
The Gale Group, Inc., a Delaware corporation and an affiliate of Cengage Learning, Inc.
TAILLE
47,9
Ko
African Energy News - volume 2 African Energy News - volume 2
2014
A Leap to an Ecological Economy A Leap to an Ecological Economy
2021
A Leap to an Ecological Economy A Leap to an Ecological Economy
2022
Brazil in the 21st century Brazil in the 21st century
2016
Designing Solutions to climate change Designing Solutions to climate change
2017
Global Development and the Environment Global Development and the Environment
2016
A Budget Without Vision A Budget Without Vision
2011
Rpps Irregularities Rpps Irregularities
2011
Its Time for Thar Coal Its Time for Thar Coal
2011
Environmental Standards are Not Met at Cement Plants - Rehmat Khan, MD/CEO Lafarge Cement Talks to EU Environmental Standards are Not Met at Cement Plants - Rehmat Khan, MD/CEO Lafarge Cement Talks to EU
2011
Another Delay in IP Gas Pipeline Project Another Delay in IP Gas Pipeline Project
2011
LPG Prices to Rise by 15% Under New Policy LPG Prices to Rise by 15% Under New Policy
2011