Publisher Description

JWST, a large, deployable telescope intended to be the successor to the Hubble Space Telescope, is one of NASA's most complex and expensive projects, at an anticipated cost of $8.8 billion. Congress set an $8 billion JWST development cost cap in 2011, and the remaining $837 million is for its operations costs. JWST is intended to revolutionize our understanding of star and planet formation and advance the search for the origins of our universe. With significant integration and testing planned for the remaining period until launch, the JWST project will still need to address many challenges during the remainder of integration and testing.

In 2017, the National Aeronautics and Space Administration's (NASA) James Webb Space Telescope (JWST) project delayed its launch readiness date by at least 5 months, and further delays are likely. The delay—from October 2018 to a launch window between March and June 2019—was primarily caused by components of JWST's spacecraft taking longer to integrate than planned. JWST made considerable progress toward the completion of integration and test activities in the past year. However, the project used all remaining schedule reserve—or extra time set aside in the schedule in the event of delays or unforeseen risks—to address technical issues, including an anomaly on the telescope found during vibration testing. Extending the launch window provided the project up to 4 months of schedule reserve. However, shortly after requesting the new launch window in September 2017, the project determined that several months of schedule reserve would be needed to address lessons learned from the initial folding and deployment of the observatory's sunshield (see image). Given remaining integration and test work ahead—the phase in development where problems are most likely to be found and schedules tend to slip—coupled with only 1.5 months of schedule reserves remaining to the end of the launch window, additional launch delays are likely. The project's Standing Review Board will conduct an independent review of JWST's schedule status in early 2018 to determine if the June 2019 launch window can be met.

GENRE
Science & Nature
RELEASED
2018
1 March
LANGUAGE
EN
English
LENGTH
57
Pages
PUBLISHER
Progressive Management
SIZE
2.8
MB

More Books Like This

Assessment of Options for Extending the Life of the Hubble Space Telescope: Assessment of Options for Extending the Life of the Hubble Space Telescope:
2005
Science Opportunities Enabled by NASA's Constellation System Science Opportunities Enabled by NASA's Constellation System
2008
Evaluation of the Implementation of WFIRST/AFTA in the Context of New Worlds, New Horizons in Astronomy and Astrophysics Evaluation of the Implementation of WFIRST/AFTA in the Context of New Worlds, New Horizons in Astronomy and Astrophysics
2014
Launching Science: Launching Science:
2009
NASA Space Technology Report: Goddard's Astrophysics Science Division - Annual Report 2011, Research Highlights, Fermi Gamma-Ray Space Telescope, Rossi, HST, Swift, GALEX, HEASARC, WMAP NASA Space Technology Report: Goddard's Astrophysics Science Division - Annual Report 2011, Research Highlights, Fermi Gamma-Ray Space Telescope, Rossi, HST, Swift, GALEX, HEASARC, WMAP
2014
Progress Toward Implementation of the 2013 Decadal Survey for Solar and Space Physics Progress Toward Implementation of the 2013 Decadal Survey for Solar and Space Physics
2020

More Books by Progressive Management

Wings in Orbit: Scientific and Engineering Legacies of the Space Shuttle, 1971-2010 Wings in Orbit: Scientific and Engineering Legacies of the Space Shuttle, 1971-2010
2011
2011 Complete Guide to IEDs: Improvised Explosive Devices: Enemy Tactics, Roadside Bombs, Counter-IED Targeting, Defeat the Device, Programs, Technologies, Afghanistan, Iraq, JIEDDO 2011 Complete Guide to IEDs: Improvised Explosive Devices: Enemy Tactics, Roadside Bombs, Counter-IED Targeting, Defeat the Device, Programs, Technologies, Afghanistan, Iraq, JIEDDO
2010
Nigeria: Federal Research Study and Country Profile with Comprehensive Information, History, and Analysis - Politics, Economy, Military Nigeria: Federal Research Study and Country Profile with Comprehensive Information, History, and Analysis - Politics, Economy, Military
2011
21st Century Guide to Solar Power and Photovoltaics: Green Domestic Power from the Sun - Practical Information about Home Electricity, Water Heating, Panel and Cells, Solar Energy Financing 21st Century Guide to Solar Power and Photovoltaics: Green Domestic Power from the Sun - Practical Information about Home Electricity, Water Heating, Panel and Cells, Solar Energy Financing
2010
The Smell of Kerosene: A Test Pilot's Odyssey - NASA Research Pilot Stories, XB-70 Tragic Collision, M2-F1 Lifting Body, YF-12 Blackbird, Apollo LLRV Lunar Landing Research Vehicle (NASA SP-4108) The Smell of Kerosene: A Test Pilot's Odyssey - NASA Research Pilot Stories, XB-70 Tragic Collision, M2-F1 Lifting Body, YF-12 Blackbird, Apollo LLRV Lunar Landing Research Vehicle (NASA SP-4108)
2012
21st Century U.S. Military Manuals: Sniper Training - FM 23-10 - Marksmanship, Equipment, Ballistics, Weapon Capabilities, Sniping Techniques (Value-Added Professional Format Series) 21st Century U.S. Military Manuals: Sniper Training - FM 23-10 - Marksmanship, Equipment, Ballistics, Weapon Capabilities, Sniping Techniques (Value-Added Professional Format Series)
2011