• 7,49 €

Descrizione dell’editore

An increasing share of intermittent renewable generation and reduced profitability of conventional power generation has led to a growing concern for capacity adequacy in the Nordic electricity market (Nord Pool market area). It does not make sense to assess capacity adequacy for each country separately in the Nord Pool market area as it is highly integrated in terms of both interconnector capacity and market integration. Capacity challenges are rarely isolated to one country or bidding zone. This report analyses what market solutions may be used to manage capacity adequacy in the Nord Pool market area, and how an efficient transition to adequate market solutions could be achieved. The main analysis reveals several measures that would strengthen price formation and cost recovery in the Nord Pool market area, although in general, the market is already highly liquid and well-functioning.

GENERE
Scienza e natura
PUBBLICATO
2015
26 agosto
LINGUA
EN
Inglese
PAGINE
143
EDITORE
Nordic Council of Ministers
DIMENSIONE
15.8
MB

Altri libri di Nordic Council of Ministers