Manual for a Risk Management System for a company
Risk and Contract Management
-
- ¥1,600
-
- ¥1,600
発行者による作品情報
In risk management it is important to achieve a healthy balance between risk control and risk volume, meaning that the single projects within a company have to be categorised as processes according to their complexity and size. If this is accomplished it is possible to assess the ongoing and pending business projects without disproportionate effort.
The assessment of control effort will, above all, be made according to the volume which a project has to realise monetarily: A project having a significant sales volume will therefore experience special attention during risk control and in the graded risk control system it will assume a higher position than a project which shows a lower sales volume.
Defizitbegrenzende Haushaltsregeln und nationaler Stabilitätspakt in Deutschland
2008年
Gewährleistungsrecht des Kaufvertrages
2009年
Project Management Baseline
2010年
Basics of major strategic (and analytic) tools
2009年
Influence of salary and monetary incentives on project performance
2009年
Der Verbraucherkaufvertrag des BGB
2009年