Dalton v. Pioneer Sand & Gravel Co. Dalton v. Pioneer Sand & Gravel Co.

Dalton v. Pioneer Sand & Gravel Co‪.‬

WA.40229; 227 P.2d 173; 37 Wash. 2d 946 (1951)

    • 0,99 €
    • 0,99 €

Publisher Description

[37 Wash2d Page 947] The plaintiff, desiring to lay a concrete floor in his basement, ordered the required amount of ready-mix cement from the defendant, who delivered it to plaintiff's home. The mix was poured directly into the basement from the truck by means of a chute, where the plaintiff, attired in heavy shoes, overalls and gloves, spread it with a shovel. After the floor was covered, he knelt on a large board, without using any knee pads, and finished the smoothing of the surface with a smaller board and a trowel. The entire operation took about two hours.

GENRE
Professional & Technical
RELEASED
1951
1 February
LANGUAGE
EN
English
LENGTH
2
Pages
PUBLISHER
LawApp Publishers
SIZE
60.5
KB