NASA Lunar Programs: Opportunities Exist to Strengthen Analyses and Plans for Moon Landing - Recommendations to Create Cost Estimates and Schedules for Artemis Human Missions and Lunar Gateway Station NASA Lunar Programs: Opportunities Exist to Strengthen Analyses and Plans for Moon Landing - Recommendations to Create Cost Estimates and Schedules for Artemis Human Missions and Lunar Gateway Station

NASA Lunar Programs: Opportunities Exist to Strengthen Analyses and Plans for Moon Landing - Recommendations to Create Cost Estimates and Schedules for Artemis Human Missions and Lunar Gateway Station

    • 2,99 €
    • 2,99 €

Publisher Description

In March 2019, the White House directed NASA to accelerate its plans to return humans to the moon by 4 years, to 2024. To accomplish a lunar landing, NASA is developing programs including a small platform in lunar orbit, known as Gateway, and a lunar lander. NASA plans to use the Space Launch System and Orion crew capsule—two programs with a history of cost growth and schedule delays—to launch and transport crew to Gateway. The House Committee on Appropriations included a provision in its 2018 report for GAO to review NASA's proposed lunar-focused programs, including the Gateway program. GAO's report assesses (1) how NASA updated its lunar plans to support the accelerated 2024 landing timeline; (2) the extent to which NASA has made initial decisions about requirements, cost, and schedule for its lunar mission and programs; and (3) the extent to which NASA analyzed alternatives for its lunar plans, including the Gateway program. GAO analyzed NASA lunar mission and program documents, assessed NASA studies that informed NASA's lunar plans, and interviewed NASA officials.

To support accelerated plans to land astronauts on the moon by 2024—four years earlier than planned—the National Aeronautics and Space Administration (NASA) quickly refocused its acquisition plans. In particular, NASA separated its lunar plans into two phases, with the first phase focused on the systems NASA identified to support the new timeline (see figure). One system, Gateway, includes three components—power and propulsion, habitation, and logistics—to form a small platform in lunar orbit.

NASA has begun making decisions related to requirements, cost, and schedule for programs, but is behind in taking these steps for the whole lunar mission: NASA risks the discovery of integration challenges and needed changes late in the development process because it established some requirements for individual lunar programs before finalizing requirements for the overall lunar mission. NASA plans to take steps to mitigate this risk, such as by holding reviews to ensure that requirements align across programs, but has not yet defined these reviews or determined when they would occur. NASA has made some decisions that will increase visibility into the costs and schedules for individual lunar programs, but does not plan to develop a cost estimate for the first mission. Cost estimates provide management with critical cost-risk information to improve control of resources. Without a cost estimate for this mission, Congress will not have insight into affordability and NASA will not have insight into monitoring total mission costs.

GENRE
Professional & Technical
RELEASED
2019
19 December
LANGUAGE
EN
English
LENGTH
52
Pages
PUBLISHER
Progressive Management
SIZE
1.7
MB

More Books by Progressive Management

Apollo and America's Moon Landing Program: Remembering The Giants - Apollo Rocket Propulsion Development (NASA SP-2009-4545) - Saturn V, CSM, and Lunar Module Engines Including F-1, J-2, and SPS Apollo and America's Moon Landing Program: Remembering The Giants - Apollo Rocket Propulsion Development (NASA SP-2009-4545) - Saturn V, CSM, and Lunar Module Engines Including F-1, J-2, and SPS
2011
U.S. Marine Corps Training Manual: Expeditionary Operations, MCDP 3 - USMC Marines Document Series U.S. Marine Corps Training Manual: Expeditionary Operations, MCDP 3 - USMC Marines Document Series
2010
A Short History of Biological Warfare: From Pre-History to the 21st Century - Reviews BW Studies, Biowarfare Agents and Toxins, Japanese Attacks in China, Cold War Research, and Terrorism Threats A Short History of Biological Warfare: From Pre-History to the 21st Century - Reviews BW Studies, Biowarfare Agents and Toxins, Japanese Attacks in China, Cold War Research, and Terrorism Threats
2017
Organized Crime Growth and Sustainment: A Review of the Influence of Popular Religion and Beliefs in Mexico - Drug Gangs, El Chapo, Narco-Cultura, Narco-Corridos, Sinaloa Cartel, Malverde Cult, Saints Organized Crime Growth and Sustainment: A Review of the Influence of Popular Religion and Beliefs in Mexico - Drug Gangs, El Chapo, Narco-Cultura, Narco-Corridos, Sinaloa Cartel, Malverde Cult, Saints
2016
Recommendation for a National Standard for Tactical Emergency Casualty Care and Israeli Hospital Trauma Protocols in the United States: Active Shooter and Terrorist Attacks, EMS Protocol Deficiencies Recommendation for a National Standard for Tactical Emergency Casualty Care and Israeli Hospital Trauma Protocols in the United States: Active Shooter and Terrorist Attacks, EMS Protocol Deficiencies
2016
India in Perspective: Orientation Guide and Gujarati, Hindi, Kashmiri, Punjabi, Telegu Cultural Orientation: Geography, History, Economy, Security, Sikh, Gandhi, Nehru, Ganges, Delhi, Mumbai, Indus India in Perspective: Orientation Guide and Gujarati, Hindi, Kashmiri, Punjabi, Telegu Cultural Orientation: Geography, History, Economy, Security, Sikh, Gandhi, Nehru, Ganges, Delhi, Mumbai, Indus
2015