The Performance of Traditional Contract Procurement on Housing Projects in Nigeria (Report) The Performance of Traditional Contract Procurement on Housing Projects in Nigeria (Report)

The Performance of Traditional Contract Procurement on Housing Projects in Nigeria (Report‪)‬

Civil Engineering Dimension 2006, Sept, 8, 2

    • 25,00 kr
    • 25,00 kr

Publisher Description

ABSTRACT The traditional contract procurement has been widely criticized as an ineffective procurement method because it often involves time and cost overrun on construction projects. Yet the method is still being widely used in Nigeria most especially for the procurement of housing projects. It is suspected that this procurement method may not be ineffective in all cost categories of housing projects. Therefore time and cost performances of the procurement method on 57 housing projects of varying cost categories initiated by the Nigerian government between 1993 and 1999 were studied. The category of one to five million naira (US$1.00 [approximately equal to] 92 Nigerian Naira in 1999) showed the least time overrun of 18.98% while the highest time overrun of 99.64 % was shown in the five to ten million naira. The over ten million naira category had the least cost overrun of 9.13% while the highest cost overrun of 34.55 % was shown in the less than one million naira. The one to five million naira cost category exhibited weak correlation between time and cost overruns but the five million naira and above categories showed strong correlation. It was concluded that one to five million naira cost category is quite suitable for traditional contract procurement on housing projects in Nigeria.

GENRE
Professional & Technical
RELEASED
2006
1 September
LANGUAGE
EN
English
LENGTH
19
Pages
PUBLISHER
Civil Engineering Dimension
SIZE
202.9
KB

More Books by Civil Engineering Dimension

Concrete Mix Design Optimized Approach (Technical Note) (Report) Concrete Mix Design Optimized Approach (Technical Note) (Report)
2004
Managing the Building Design Process for Sustainabilty and Improved Quality (Report) (Case Study) Managing the Building Design Process for Sustainabilty and Improved Quality (Report) (Case Study)
2006
An Investigation of the Performance of Due Process Mechanism in the Execution of Construction Projects in Nigeria (Report) An Investigation of the Performance of Due Process Mechanism in the Execution of Construction Projects in Nigeria (Report)
2009
Owner and Contractor Perceptions Toward Factors Causing Delays in Structural and Finishing Works (Report) Owner and Contractor Perceptions Toward Factors Causing Delays in Structural and Finishing Works (Report)
2010
An Appraisal of Project Procurement Methods in the Nigerian Construction Industry (Report) An Appraisal of Project Procurement Methods in the Nigerian Construction Industry (Report)
2010
Technical Note: An Assessment of Practicing Reflection in Teaching the Concepts for Engineering Statistics (Report) Technical Note: An Assessment of Practicing Reflection in Teaching the Concepts for Engineering Statistics (Report)
2011