Palin V. General Construction Co.
-
- 0,99 €
-
- 0,99 €
Descrição da editora
This is an action commenced by the respondent to recover damages for the loss of a quantity of oil (crankcase drainings) from his storage tank (55 feet in diameter and 30 feet high), located in an area acquired by King county in 1950 for an extension of the Boeing airfield runway. The respondent had until April 15, 1951, to remove the tank from the premises, and was entitled to use it and have access to it until that date.