Shrinking Behind Schedule (Unabridged)
-
- $4.99
-
- $4.99
Publisher Description
Elena works a stressful job for a high-class fashion magazine. The hours are brutal, the workload is heavy. She needs a release from time to time, and alcohol just doesn't cut it....
But Elena has a secret....
A friend gave her a special little potion that makes her shrink! She loves the feeling of growing smaller, of feeling her clothes slip away, of seeing the world swell around her. The effects take hours, so she drinks the potion at work. By the time she's off the subway and in her apartment, she's less than two-feet tall...and still shrinking.
But today, the train has a hiccup, and she's delayed. Now, she's in a crowded place, steadily getting smaller while everyone else rises around her....
Contains: (Shrinking woman)