Considerations for Transitioning Highly Available Applications to System z Considerations for Transitioning Highly Available Applications to System z

Considerations for Transitioning Highly Available Applications to System z

Publisher Description

You may have several triggers to investigate the feasibility of moving a workload or set of workloads to the IBM® System z® platform. These triggers could be concerns about operational cost, manageability, or delivering the agreed service levels, among others.

Investigating the feasibility of a possible migration or transition to any other platform, including System z, requires a number of basic steps. These steps usually start with an understanding of the current workload and its pain points, and end with a business case to move the workload. It is important to find out how easy a migration is going to be and how much risk will be involved.

In this IBM Redbooks® publication we offer thoughts on how to move through these steps. We also include a chapter with a System z technology summary to help you understand how a migrated workload may fit on the platform.

Our focus in this book is on workloads that are mission-critical and require a high level of availability, including disaster recovery.

GENRE
Computers & Internet
RELEASED
2011
September 30
LANGUAGE
EN
English
LENGTH
258
Pages
PUBLISHER
IBM Redbooks
SELLER
International Business Machines Corp
SIZE
3
MB
Practical Migration from x86 to Linux on IBM System z Practical Migration from x86 to Linux on IBM System z
2014
End-to-End High Availability Solution for System z from a Linux Perspective End-to-End High Availability Solution for System z from a Linux Perspective
2014
Practical Migration from x86 to LinuxONE Practical Migration from x86 to LinuxONE
2017
CompTIA Cloud+ Certification All-in-One Exam Guide (Exam CV0-003) CompTIA Cloud+ Certification All-in-One Exam Guide (Exam CV0-003)
2021
IBM Technical Computing Clouds IBM Technical Computing Clouds
2013
Introduction to the New Mainframe: IBM z/VSE Basics Introduction to the New Mainframe: IBM z/VSE Basics
2016
TCP/IP Tutorial and Technical Overview TCP/IP Tutorial and Technical Overview
2006
Advanced Networking Concepts Applied Using Linux on IBM System z Advanced Networking Concepts Applied Using Linux on IBM System z
2012
IPv6 Introduction and Configuration IPv6 Introduction and Configuration
2012
Network Intrusion Prevention Design Guide: Using IBM Security Network IPS Network Intrusion Prevention Design Guide: Using IBM Security Network IPS
2011
IT Security Compliance Management Design Guide with IBM Tivoli Security Information and Event Manager IT Security Compliance Management Design Guide with IBM Tivoli Security Information and Event Manager
2010
IBM/Cisco Multiprotocol Routing: An Introduction and Implementation IBM/Cisco Multiprotocol Routing: An Introduction and Implementation
2009