Developing China's West: A Critical Path to Balanced National Development المزيد من الكتب المشابهة
Chinese Regions in Change
٢٠١٥
Economic Development and Inequality in China
٢٠١٧
The Geographical Transformation of China
٢٠١٤
Annual Analysis of Competitiveness, Simulation Studies and Development Perspective for 34 Greater China Economies: 2000–2010
٢٠١٣
Fujian: A Coastal Province in Transition and Transformation
٢٠٠٠
Annual Report on the Development of China’s Special Economic Zones(2018)
٢٠١٩
China’s Economic Reform and Development during the 13th Five-Year Plan Period
٢٠٢٠
Southern China
٢٠١٣
2015 Estimation of Agricultural Productivity and Annual Update of Competitiveness Analysis for Greater China
٢٠١٦
Sustainable Development in Rural China
٢٠١٥
Guangdong: Preparing for the WTO Challenge
٢٠٠٣
The Asian Economy
٢٠٢٠
Economic Implications of China's "Go-West" Policy: A View from Thailand.
٢٠٠٦
GUANGDONG-HONG KONG-MACAO GREATER BAY AREA
٢٠٢١
Asian and Pacific Cities
٢٠١٣