Heuristics for Scheduling Operations in MRP: Flowshop Case (Material Requirements Planning)
Academy of Information and Management Sciences Journal 2006, July, 9, 2
-
-
2.0 • 1 Rating
-
-
- $5.99
-
- $5.99
Publisher Description
ABSTRACT This paper investigates the issue of operations scheduling for Material Requirements Planning (MRP) Systems. Two general scheduling approaches, namely forward and backward procedures, are proposed to perform operations scheduling in MRP. Moreover, we develop various heuristic scheduling rules for use in the two general scheduling approaches. A simulation experiment is conducted to study the effectiveness of the proposed heuristics under the flowshop case--a manufacturing environment where all jobs processed in the shop must follow the same machine or workstation sequence. Lastly, we present and discuss the computational results obtained from our simulation experiment.
Stochastic Dynamic Lot-Sizing in Supply Chains
2015
Capacity and Inventory Planning for Make-to-Order Production Systems
2013
Capacitated Lot-Sizing and Scheduling with Scarce Setup Resources
2016
Production Planning with Capacitated Resources and Congestion
2020
Handbook of Stochastic Models and Analysis of Manufacturing System Operations
2013
Essays in Production, Project Planning and Scheduling
2013
Employee Performance Evaluation Using the Analytic Hierarchy Process (Manuscripts)
2003
The Ebay Factor: The Online Auction Solution to the Riddle of Reverse Logistics (Manuscripts)
2005
Six Sigma and Innovation (Manuscripts)
2003
E-Commerce Security Standards and Loopholes (Manuscripts)
2000
Customer Relationship Management Strategies for the Internet (Company Overview)
2001
Toward an Understanding of MIS Survey Research Methodology: Current Practices, Trends, And Implications for Future Research (Manuscripts)
2003