Student Housing Real Estate
A Practitioner's Guide to Bed-Weeks, RevPAB, Nomination Agreements and the Rent Roll That Is Re-Sold Every September
-
- $12.99
-
- $12.99
Publisher Description
Student housing is the only institutional asset class whose entire rent roll expires on the same day every year. Not a fifth of it, as in an office building on five-year leases. All of it. Every bed is re-let, to a different person, in the same eight-week window, every September, for as long as the asset exists — ten times over a ten-year hold, with no year off, to customers who are eighteen years old.
Everything follows from that, including the thing the asset class is most often mispriced on. In an office building, occupancy is a measurement: it tells you what happened. In student housing it is a decision — a price the operator chose to pay. An operator who wants a higher number can always buy one, and the discount that buys it is charged to every bed in the building, not only to the one still empty.
This book underwrites one scheme completely: 520 beds in Leeds, six room types, offered at £41.7 million on a 5.45 per cent yield. The rate card says £192.98 a week. What is actually collected, after the early-booking discount, the August discount, agent commission and arrears, is £181.35. Revenue per available bed — the number that cannot be traded — is £173.61. The gap between the first figure and the last is 10.0 per cent, and no yield in the pack discloses it.
It then prices the things the pack leaves out. A single point of occupancy is worth £39,600 of net operating income and £681,613 of value — so the discount that buys it is almost never worth what it costs. Across the entire range of rate this operator can actually use, occupancy moves 11.5 points while revenue moves 3.9 per cent: an occupancy figure quoted without the rate that bought it carries almost no information. A nomination agreement that looks like an 8.8 per cent discount is a 21.2 per cent discount once the missing weeks are counted. An all-inclusive rent makes the landlord short energy with no ability to reprice for two years — a fifty per cent move costs 6.4 per cent of net operating income, and the business-rates exemption alone is worth £5.1 million of value. The summer programme, which the pack shows gross, carries VAT and council tax worth £43,496 a year.
The valuation chapters ask where the money actually is: 58.8 per cent of the value is the exit yield somebody else applies in year ten, against 41.2 per cent from ten years of running the building. The quoted 5.45 per cent yield is 4.69 per cent once the refurbishment cycle is paid for. A lender advances 50.5 per cent of the price, because it lends against beds it can re-let. And the bid chapter inverts the model to ask what would have to be true — finding that two of the four assumptions have no solution at any price.
It is written for acquisitions and asset management teams, for operators negotiating nomination agreements and management contracts, for lenders sizing against a rent roll that does not exist yet, for valuers, and for anyone handed a pack whose headline is an occupancy rate.
Four Excel workbooks accompany the book, with no sign-up. Every figure the book prints is reproduced by a live formula, and the model workbook ends with a sheet comparing the two line by line.
About this edition: the text of this book was generated with AI (Claude) and published by the author.