Construction Cost Control
Construction Cost Management and Contract Administration from the Contract Sum to the Final Account
-
- $12.99
-
- $12.99
Publisher Description
The contract sum was 26,301,102. The final account was 29,153,363. The building that was handed over is the building that was drawn.
Nothing exotic happened at Pemberton Yard. No insolvency, no fire, no unforeseeable ground, no litigation. Ninety-six apartments over six stories, signed for 94 weeks, and the client paid 2,852,261 more than it agreed to, which is 10.8 per cent. This book takes that figure apart eleven times, one chapter per line, and finds that every pound of it is one of three things. Building the client bought: 1,052,000. Price the client lost: 2,030,500. Money recovered: 230,239.
Of the price lost, 1,742,160, or 85.8 per cent, was knowable on the day both parties signed. The design was 72.0 per cent issued, which put 6,852,067 of the building beyond a fixed price. The provisional sums stood at 1,340,000 and released at 2,150,000, an overrun of 60.4 per cent and the largest single line in the account.
The scheme was underwritten at 17.40 per cent profit on cost and delivered 8.59, losing 46.6 per cent of the profit to a 10.8 per cent overrun. The same building, bought differently, cost 90,648 more at contract and 1,620,289 less at final account, a return of 17.9 to 1.
The models are not described; they are supplied. Four Excel workbooks accompany the book: both bridges with all eleven lines and their workings; the appraisal run six ways; six one-input sensitivities; and a calculator for a project that has not been signed yet. Every printed figure is reproduced by a live formula under 242 checks.
For development managers, fund and asset managers, lenders and monitoring surveyors, and quantity surveyors and cost consultants on either side of the table.
About this edition: the text of this book was generated with AI (Claude) and published by the author.