Inland Navigation System Planning Inland Navigation System Planning

Inland Navigation System Planning

The Upper Mississippi River-Illinois Waterway

    • $36.99
    • $36.99

Publisher Description

In 1988, the U.S. Army Corps of Engineers began an investigation of the benefits and costs of extending several locks on the lower portion of the Upper Mississippi River-Illinois Waterway (UMR-IWW) in order to relieve increasing waterway congestion, particularly for grain moving to New Orleans for export. With passage of the Flood Control Act of 1936, Congress required that the Corps conduct a benefit-cost analysis as part of its water resources project planning; Congress will fund water resources projects only if a project's benefits exceed its costs. As economic analysis generally, and benefit-cost analysis in particular, has become more sophisticated, and as environmental and social considerations and analysis have become more important, Corps planning studies have grown in size and complexity. The difficulty in commensurating market and nonmarket costs and benefits also presents the Corps with a significant challenge. The Corps' analysis of the UMR-IWW has extended over a decade, has cost roughly $50 million, and has involved consultations with other federal agencies, state conservation agencies, and local citizens. The analysis has included many consultants and has produced dozens of reports.

In February 2000, the U.S. Department of Defense (DOD) requested that the National Academies review the Corps' final feasibility report. After discussions and negotiations with DOD, in April 2000 the National Academies launched this review and appointed an expert committee to carry it out.

GENRE
Science & Nature
RELEASED
2001
March 30
LANGUAGE
EN
English
LENGTH
130
Pages
PUBLISHER
National Academies Press
SELLER
National Academy of Sciences
SIZE
2.3
MB

More Books Like This

Review of the U.S. Army Corps of Engineers Restructured Upper Mississippi River-Illinois Waterway Feasibility Study Review of the U.S. Army Corps of Engineers Restructured Upper Mississippi River-Illinois Waterway Feasibility Study
2004
A Review of the Florida Keys Carrying Capacity Study A Review of the Florida Keys Carrying Capacity Study
2002
New Directions in Water Resources Planning for the U.S. Army Corps of Engineers New Directions in Water Resources Planning for the U.S. Army Corps of Engineers
1999
Analytical Methods and Approaches for Water Resources Project Planning Analytical Methods and Approaches for Water Resources Project Planning
2004
Contaminated Sediments in Ports and Waterways Contaminated Sediments in Ports and Waterways
1997
River Basins and Coastal Systems Planning Within the U.S. Army Corps of Engineers River Basins and Coastal Systems Planning Within the U.S. Army Corps of Engineers
2004

More Books by Transportation Research Board

Design Guide for Addressing Nonrecurrent Congestion Design Guide for Addressing Nonrecurrent Congestion
2014
Guide to Incorporating Reliability Performance Measures into the Transportation Planning and Programming Processes Guide to Incorporating Reliability Performance Measures into the Transportation Planning and Programming Processes
2014
Guide to Establishing Monitoring Programs for Travel Time Reliability Guide to Establishing Monitoring Programs for Travel Time Reliability
2014
Mapping Voids, Debonding, Delaminations, Moisture, and Other Defects Behind or Within Tunnel Linings Mapping Voids, Debonding, Delaminations, Moisture, and Other Defects Behind or Within Tunnel Linings
2014
Further Development of the Safety and Congestion Relationship for Urban Freeways Further Development of the Safety and Congestion Relationship for Urban Freeways
2015
Framework for Collaborative Decision Making on Additions to Highway Capacity Framework for Collaborative Decision Making on Additions to Highway Capacity
2014