Practice Standard for Work Breakdown Structures - Third Edition Practice Standard for Work Breakdown Structures - Third Edition

Practice Standard for Work Breakdown Structures - Third Edition

    • ‏62٫99 US$
    • ‏62٫99 US$

وصف الناشر

The Work Breakdown Structure (WBS) serves as a guide for defining work as it relates to a specific project's objectives. This book supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Sixth Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.

النوع
تمويل شركات وأفراد
تاريخ النشر
٢٠١٩
٢٧ يونيو
اللغة
EN
الإنجليزية
عدد الصفحات
١٩٥
الناشر
Project Management Institute
البائع
Bookwire US Inc
الحجم
٨٫٨
‫م.ب.‬
Secrets to Mastering the WBS Secrets to Mastering the WBS
٢٠١٣
Your WBS Coach Your WBS Coach
٢٠١١
IBM Rational Unified Process Reference and Certification Guide IBM Rational Unified Process Reference and Certification Guide
٢٠٠٧
Design it 1st Design it 1st
٢٠١٦
SAP Enterprise Portfolio and Project Management SAP Enterprise Portfolio and Project Management
٢٠٢٢
Managing and Leading Software Projects Managing and Leading Software Projects
٢٠١١
A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition and The Standard for Project Management (ENGLISH) A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition and The Standard for Project Management (ENGLISH)
٢٠٢١
Agile Practice Guide Agile Practice Guide
٢٠١٧
Q & As for the PMBOK® Guide Sixth Edition Q & As for the PMBOK® Guide Sixth Edition
٢٠١٧
The Standard for Portfolio Management The Standard for Portfolio Management
٢٠١٧
The PMI Guide to Business Analysis The PMI Guide to Business Analysis
٢٠١٧
Implementing Organizational Project Management Implementing Organizational Project Management
٢٠١٤