Practice Standard for Work Breakdown Structures - Third Edition Practice Standard for Work Breakdown Structures - Third Edition

Practice Standard for Work Breakdown Structures - Third Edition

    • US$62.99
    • US$62.99

출판사 설명

The Work Breakdown Structure (WBS) serves as a guide for defining work as it relates to a specific project's objectives. This book supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Sixth Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.

장르
비즈니스 및 개인 금융
출시일
2019년
6월 27일
언어
EN
영어
길이
195
페이지
출판사
Project Management Institute
판매자
Bookwire US Inc
크기
8.8
MB
Secrets to Mastering the WBS Secrets to Mastering the WBS
2013년
Your WBS Coach Your WBS Coach
2011년
IBM Rational Unified Process Reference and Certification Guide IBM Rational Unified Process Reference and Certification Guide
2007년
Design it 1st Design it 1st
2016년
SAP Enterprise Portfolio and Project Management SAP Enterprise Portfolio and Project Management
2022년
Managing and Leading Software Projects Managing and Leading Software Projects
2011년
A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition and The Standard for Project Management (ENGLISH) A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Seventh Edition and The Standard for Project Management (ENGLISH)
2021년
Agile Practice Guide Agile Practice Guide
2017년
Q & As for the PMBOK® Guide Sixth Edition Q & As for the PMBOK® Guide Sixth Edition
2017년
The Standard for Portfolio Management The Standard for Portfolio Management
2017년
The PMI Guide to Business Analysis The PMI Guide to Business Analysis
2017년
Implementing Organizational Project Management Implementing Organizational Project Management
2014년