WIN BEFORE THE DISPUTE WIN BEFORE THE DISPUTE
#2 - Project Success Series

WIN BEFORE THE DISPUTE

    • $4.99
    • $4.99

Publisher Description

The deal you signed isn't the deal you're living. Every change order is its own negotiation, and most people don't realize they're losing it until it's already over.

The contract sets your leverage. The two years after signature decide whether you keep it, one change order at a time. A verbal direction nobody confirmed in writing. A notice deadline nobody was tracking. A clean delay claim that loses to "you were behind anyway" because nobody understood the schedule well enough to defend it. By the time anyone adds up what slipped through, the number is bigger than the contingency line.

Most books on construction claims are written for the courtroom: dense legal treatises aimed at lawyers building a case after the relationship is already broken. This one is built for the people actually running the job. Field engineers, project managers, and contracts staff who need to recognize a change the moment it happens, prove it, price it, negotiate it, and protect the win, without becoming the person nobody wants to work with for the next two years.

Win Before the Dispute is the field guide for the second half of every major project, after the contract is signed and the work is underway. That's where the real money quietly gets won or lost.

Inside, you'll discover:

- The difference between a directed change and a constructive change, and why the second kind bleeds you dry without anyone calling it a change
- How to build a notice-tracking system that catches a triggering event the same day it happens, not the same month
- Why entitlement and price are two separate arguments, and how to prove you're owed something before you ever discuss a number
- The cost everyone prices and the cost almost everyone misses: productivity loss, extended overhead, and the impact money that disappears the moment you sign "full and final"
- How to defend a clean delay claim against "you were behind anyway," without needing a forensic scheduler to do it
- The exact moment a change order conversation becomes a formal claim, and what that claim needs that a change order request never did
- How to hold your subcontractors to the same rules you're held to: line up the notice clocks, carry owner-caused claims through for them the right way, and pay fairly when the mistake is yours
- How to close out a won negotiation so the money actually lands, and stays landed

Includes the Negotiation Checklist, three ready-to-use tool pages (a notice letter, a proceeding-under-protest confirmation, and the Entitlement Page), and a plain-English glossary.

This is for project managers, field engineers, contracts staff, and contractors managing live EPC, industrial, and infrastructure projects, where the contract is signed but the negotiating never really stops.

Document it the same day. That's the whole system.

GENRE
Business & Personal Finance
RELEASED
2026
October 24
LANGUAGE
EN
English
LENGTH
80
Pages
PUBLISHER
James A Gray III
SELLER
Draft2Digital, LLC
SIZE
1.1
MB