2018 Report on James Webb Space Telescope (JWST): Integration and Test Challenges Have Delayed Launch and Threaten to Push Costs Over Cap 2018 Report on James Webb Space Telescope (JWST): Integration and Test Challenges Have Delayed Launch and Threaten to Push Costs Over Cap

2018 Report on James Webb Space Telescope (JWST): Integration and Test Challenges Have Delayed Launch and Threaten to Push Costs Over Cap

    • USD 4.99
    • USD 4.99

Descripción editorial

JWST, a large, deployable telescope intended to be the successor to the Hubble Space Telescope, is one of NASA's most complex and expensive projects, at an anticipated cost of $8.8 billion. Congress set an $8 billion JWST development cost cap in 2011, and the remaining $837 million is for its operations costs. JWST is intended to revolutionize our understanding of star and planet formation and advance the search for the origins of our universe. With significant integration and testing planned for the remaining period until launch, the JWST project will still need to address many challenges during the remainder of integration and testing.

In 2017, the National Aeronautics and Space Administration's (NASA) James Webb Space Telescope (JWST) project delayed its launch readiness date by at least 5 months, and further delays are likely. The delay—from October 2018 to a launch window between March and June 2019—was primarily caused by components of JWST's spacecraft taking longer to integrate than planned. JWST made considerable progress toward the completion of integration and test activities in the past year. However, the project used all remaining schedule reserve—or extra time set aside in the schedule in the event of delays or unforeseen risks—to address technical issues, including an anomaly on the telescope found during vibration testing. Extending the launch window provided the project up to 4 months of schedule reserve. However, shortly after requesting the new launch window in September 2017, the project determined that several months of schedule reserve would be needed to address lessons learned from the initial folding and deployment of the observatory's sunshield (see image). Given remaining integration and test work ahead—the phase in development where problems are most likely to be found and schedules tend to slip—coupled with only 1.5 months of schedule reserves remaining to the end of the launch window, additional launch delays are likely. The project's Standing Review Board will conduct an independent review of JWST's schedule status in early 2018 to determine if the June 2019 launch window can be met.

GÉNERO
Ciencia y naturaleza
PUBLICADO
2018
1 de marzo
IDIOMA
EN
Inglés
EXTENSIÓN
57
Páginas
EDITORIAL
Progressive Management
VENDEDOR
Draft2Digital, LLC
TAMAÑO
2.8
MB

Más libros de Progressive Management

21st Century Pocket Guide to Hydropower, Microhydropower and Small Systems, Incentives and Funding, Dams, Turbine Systems, Environmental Impact and Fish Passage, History, Research Projects 21st Century Pocket Guide to Hydropower, Microhydropower and Small Systems, Incentives and Funding, Dams, Turbine Systems, Environmental Impact and Fish Passage, History, Research Projects
2010
Subverting Justice: How the Former President and His Allies Pressured DOJ to Overturn the 2020 Election – First Comprehensive Accounting with New Information about Trump's Relentless Effort to Coopt the Justice Department Subverting Justice: How the Former President and His Allies Pressured DOJ to Overturn the 2020 Election – First Comprehensive Accounting with New Information about Trump's Relentless Effort to Coopt the Justice Department
2021
United States Army Cyber Center of Excellence: Signal Platoon (ATP 6-02.2) - 2020 Edition, Offense and Defense, Support to Operations, Logistics and Sustainment, Information Services, Security United States Army Cyber Center of Excellence: Signal Platoon (ATP 6-02.2) - 2020 Edition, Offense and Defense, Support to Operations, Logistics and Sustainment, Information Services, Security
2021
Domestic Terrorism, the Trump Capitol Insurrection, and Violent Extremism: Threats from Proud Boys, Oath Keepers, Neo-Nazis, Three Percenters, Groypers, QAnon, and Anti-Semitism; Dollars Against Democracy Financing; State and Local Responses Domestic Terrorism, the Trump Capitol Insurrection, and Violent Extremism: Threats from Proud Boys, Oath Keepers, Neo-Nazis, Three Percenters, Groypers, QAnon, and Anti-Semitism; Dollars Against Democracy Financing; State and Local Responses
2021
2021 National Strategy for Countering Domestic Terrorism and Assessment of the Domestic Violent Extremism (DVE) Threat - Biden White House Report, White Supremacists, Militias, Racially or Ethnically Motivated Violent Extremists (RMVEs) 2021 National Strategy for Countering Domestic Terrorism and Assessment of the Domestic Violent Extremism (DVE) Threat - Biden White House Report, White Supremacists, Militias, Racially or Ethnically Motivated Violent Extremists (RMVEs)
2021
2020 National Commission on Military Aviation Safety: Aircraft Accidents and Crashes, Mishap Rates, Human-Machine Interface, Physiological Episodes, Depot Maintenance, Maintainers as Aviation Professionals, Pilot Training, Investment in Aircrews 2020 National Commission on Military Aviation Safety: Aircraft Accidents and Crashes, Mishap Rates, Human-Machine Interface, Physiological Episodes, Depot Maintenance, Maintainers as Aviation Professionals, Pilot Training, Investment in Aircrews
2021