Critical Path Critical Path

Critical Path

    • 5.0 • 3개의 평가
    • US$9.99

출판사 설명

The masterwork of a brilliant career, and an important document of the crisis now facing mankind.


Today we find ourselves in the midst of the greatest crisis in the history of the human race. Technology has placed in our hands almost unlimited power at the very moment when we have run up against the limits of our resources aboard Spaceship Earth, as the crises of the late twentieth century—political, economic, environmental, and ethical—determine whether or not humanity survives. In this masterful summing up of an entire lifetime’s thought and concern, R. Buckminster Fuller addresses these crucial issues in his most significant, accessible, and urgent work.

Critical Path traces the origins and evolution of humanity’s social, political, and economic systems from the obscure mists of prehistory, through the development of the great political empires, to the vast international corporate and political systems that control our destiny today to show how we got to our present situation and what options are available to man. With his customary brilliance, extraordinary energy, and unlimited devotion, Bucky Fuller shows how mankind can survive, and how each individual can respond to the unprecedented threat we face today.

The crowning achievement of an extraordinary career, Critical Path offers the reader the excitement of understanding the essential dilemmas of our time and how responsible citizens can rise to meet this ultimate challenge to our future.

  • 장르
    예술 및 엔터테인먼트
    출시일
    2015년
    9월 15일
    언어
    EN
    영어
    길이
    891
    페이지
    출판사
    The Estate of R. Buckminster Fuller
    판매자
    The Estate of R. Buckminster Fuller
    크기
    82.5
    MB

    사용자 리뷰

    pookie777 ,

    Critical Path: the culmination of brilliance

    Here it is, BFs apex opus: synthesizes the planetary experience in time and projects forward several scenarios which primarily depend on mankind's level of consciousness and awakening.

    It is clear that BF is the voice of nature riding on the rails of man’s values and technology...as always nature will win but will man survive or perish along the way..it truly is up to us and our choices.

    If you yearn to deeply understand the complexity and interdependencies of our world, and it’s potential impacts on nature and our future...it is all here within the mind of a genius.

    Utopia or Oblivion Utopia or Oblivion
    1968년
    Grunch of Giants Grunch of Giants
    2016년
    Operating Manual for Spaceship Earth Operating Manual for Spaceship Earth
    2015년
    How Design Makes the World How Design Makes the World
    2020년
    Curiosities Revealed Curiosities Revealed
    2024년
    How Buildings Learn How Buildings Learn
    1994년
    Grunch of Giants Grunch of Giants
    2016년
    Operating Manual for Spaceship Earth Operating Manual for Spaceship Earth
    2015년
    Education Automation Education Automation
    1962년
    Utopia or Oblivion Utopia or Oblivion
    1968년
    Earth, Inc. Earth, Inc.
    1973년
    Rich Dad's CashFlow Quadrant Rich Dad's CashFlow Quadrant
    2015년
    The Code Breaker The Code Breaker
    2021년
    Atomic Habits Atomic Habits
    2018년
    Make Something Wonderful Make Something Wonderful
    2023년
    The Art of War The Art of War
    2010년